We provide EVM Technozion 15 online (apkid: evm.technozion.15) in order to run this application in our online Android emulator.
Description:

Download this app named EVM Technozion 15.
This app is to be used by the event managers in Technozion 2015 to1.
get user list in their event
2.
update event and notify users
3.
register participants on spot
4.
update leaderboard
Updates:
- Search bar to check whether tzid exists- Attendance system for users for a event
- Notification system updated
Free download Android EVM Technozion 15 from MyAndroid.net
MyAndroid is not a downloader online for EVM Technozion 15. It only allows to test online EVM Technozion 15 with apkid evm.technozion.15. MyAndroid provides the official Google Play Store to run EVM Technozion 15 online.
©2025. MyAndroid. All Rights Reserved.
By OffiDocs Group OU – Registry code: 1609791 -VAT number: EE102345621.
