We provide ARMS® On Mobile online (apkid: aom.armsproject) in order to run this application in our online Android emulator.


Description:

Run this app named ARMS® On Mobile using MyAndroid.
You can do it using our Android online emulator.

The latest Mobile solution from Laminaar Aviation Infotech Pvt.
Ltd.
is an extension of the ARMS V2 Suite.
A state-of-the-art mobility solution that offers Airlines and Air Operators access to various Crew specific information from across various sub- systems of the ARMS V2 Suite.
AOM provides data to end-users in real time, as well as offline mode.
The same investment can also enable the use of rapidly proliferating "Mobile Smartphone Devices" for other functions as well, e.g., for Cabin Crew, MNE Crew and Load Masters, etc., all controlled by a unified Backend Server infrastructure.
ARMS on Mobile- comprises the Server-side components and the Mobile-side (Client) application.
The other big advantage of ARMS on Mobile is that it is an integral part of the ARMS V2 Suite; which means it can seamlessly integrate with all the other sub-systems of ARMS Suite thereby offering a truly integrated end-to-end Mobility solution.

MyAndroid is not a downloader online for ARMS® On Mobile. It only allows to test online ARMS® On Mobile with apkid aom.armsproject. MyAndroid provides the official Google Play Store to run ARMS® On Mobile online.

Page navigation:

©2025. MyAndroid. All Rights Reserved.

By OffiDocs Group OU – Registry code: 1609791 -VAT number: EE102345621.

×
Advertisement
❤️Shop, book, or buy here — no cost, helps keep services free.